This week the metal poly tunnel frame has been moved ready to be put up, barrels collected to be filled with cement, plastic brought and metal poles cut to size to sit in the barrels to heightened the tunnel allowing the tractor to fit in.
Help was needed by out friend Thierry from down the road who's tractor held the first arc in place enabling the rest to put erected. lots of ladder climbing, (thankfully not by me) later and it was up with ties holding it in place before being wired and tied in place. It now awaits its plastic cover,I understand a little job for tomorrow.
Comments
Post a Comment